Sunbury Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Pre-Handover (PCI) Inspections in Sunbury

The last inspection before you pay the final claim and take the keys. We go through the house and the outside before the builder hands over.

  • Booked a week before keys
  • Roof viewed by drone or ladder
  • Balustrades pushed and checked
  • Report written for your builder
  • Items numbered for sign off
  • Reinspection before final payment
  • Guide to Standards and Tolerances
  • Outside walls walked in full
Request a quoteTell us the job and we will call you back.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

What is included

What is included in a Sunbury pre-handover (PCI) inspection

A Sunbury pre-handover inspection is assessed against your building contract and selections, the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3740 for wet areas and AS 3700 for masonry.

Roof and gutters

  • Dented or scratched roof sheets
  • Flashings and sealant
  • Gutter fall and ponding
  • Downpipes fitted and fixed

Brick and render

  • Weep holes open and clear
  • Perpend and bed joints
  • Control joints left flexible
  • Overhang at the slab edge

Ground clearances

  • Weep hole height above paving
  • Cladding gap to concrete
  • Paths falling away from walls

Doors and glazing

  • Doors hung the right way
  • Latching without binding
  • Cracked or scratched glass

Safety items

  • Balustrade fixing and height
  • Stair and landing finishes
  • Trip edges at thresholds

Interior finish

  • Plaster cracks and cornice joints
  • Paint coverage under normal light
  • Skirtings and architraves

Wet areas

  • Silicone at hobs and benches
  • Wastes run and watched for leaks
  • Fittings installed and secure

Floors

  • Springy or squeaking sections
  • Tile lippage and cracked tiles
  • Floor coverings finished

Roof space

  • Insulation laid and in place
  • Ducts supported
  • Sarking under metal roofing

29 checkpoints across 9 areas on a standard Sunbury pre-handover (PCI) inspection. Anything blocked, locked or unsafe to reach on the day is written up as not inspected, never as passed.

Sample findings

Sample defects found during our pre-handover (PCI) inspections in Sunbury

Each one recorded at a Sunbury handover in the past year.

Balcony balustrade loose at handover, a fall hazard for anyone leaning on it, found during a pre-handover inspection in Sunbury
Balcony balustrade loose at handover, a fall hazard for anyone leaning on it
Downpipes still not installed with handover days away, found during a pre-handover inspection in Sunbury
Downpipes still not installed with handover days away
Metal roof sheets dented and scratched through the paint layer, found during a pre-handover inspection in Sunbury
Metal roof sheets dented and scratched through the paint layer
Flashing sloping back toward the house, steering water at the wall, found during a pre-handover inspection in Sunbury
Flashing sloping back toward the house, steering water at the wall
Wall capping laid flat or back-falling, so rain sits on top, found during a pre-handover inspection in Sunbury
Wall capping laid flat or back-falling, so rain sits on top
Weep holes sitting too close to the finished ground outside, found during a pre-handover inspection in Sunbury
Weep holes sitting too close to the finished ground outside
Cladding finishing less than 75mm above the concrete path, found during a pre-handover inspection in Sunbury
Cladding finishing less than 75mm above the concrete path
Front door hung in reverse, with the glazing beads on the outside, found during a pre-handover inspection in Sunbury
Front door hung in reverse, with the glazing beads on the outside
Degraded sealant on roof flashings, weakening the weatherproofing, found during a pre-handover inspection in Sunbury
Degraded sealant on roof flashings, weakening the weatherproofing
Render carried over a control joint that should stay flexible, found during a pre-handover inspection in Sunbury
Render carried over a control joint that should stay flexible
Our inspectors going through a report
Why Sunbury owners choose us

Independent. Licensed. Insured.

  • Sunbury runs on two clocks: brand new estates south of the creek and homes that have stood for decades. We inspect both every month.
  • Frame findings are read against the lot engineering, so a missing tie-down is named, located and photographed.
  • Your report lands within a day, written by the person who walked the job.
  • Questions after the report go straight to that same inspector, not a call centre.
Guides

Pre-Handover (PCI) Inspections guides for Sunbury

All guides →

Book pre-handover (pci) inspections in Sunbury

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-Handover (PCI) Inspections in Sunbury: common questions

When should the Sunbury handover inspection happen?

About a week before the builder's handover date, once cleaning is done. That leaves time to fix items before you sign.

Why so much attention on the outside walls?

Because that is where our Sunbury handovers keep failing: flashings and cappings sloping the wrong way, weep holes and cladding too close to the ground. Each one lets water in later.

How do you look at the roof at a Sunbury handover?

We view it by drone or from a ladder where it is safe. Dents, scratches through the paint and failed sealant on flashings are all common findings.

What is not included in a Sunbury pre-handover inspection?

We do not energise or test electrical circuits, pressure test plumbing or gas, commission appliances, heating or cooling, or issue the occupancy permit. Items are operated by hand only, and anything we cannot reach is listed.

CallGet a Free Quote